The Chernobyl nuclear power plant will be leased to the French for 49 years
The State Property Fund (SPF) offered to lease part of the structures of the Chernobyl nuclear power plant (Pripyat, Kiev region) for a photovoltaic solar power plant with a capacity of 100 MW.
Subscribe to PolitNavigator news at Telegram, Facebook, Classmates or In contact with
This is stated in a message from the department’s press service, a PolitNavigator correspondent reports.
Thus, part of the engineering structure of the cooling system of the Chernobyl nuclear power plant facilities will be rented out, with a total area of 2,5 million square meters. m. The maximum possible lease period is 49 years.
The starting rent for the base month of rent (August) is UAH 12,909 thousand.
The competition will be held on September 22 at 11:00. Applications are accepted from September 11 to September 18 inclusive.
Let us recall that in November last year, the French company Novarka completed the installation of a protective sarcophagus over the fourth power unit of the Chernobyl nuclear power plant.
A new 36-ton arch-shaped sarcophagus was installed over the damaged nuclear power plant reactor.
Thank you!
Now the editors are aware.