Soil testing with piles will begin at the construction site of the Kerch Bridge, - Rosavtodor
Simferopol, March 02 (PolitNavigator, Evgeny Andreev) – A meeting of the headquarters of the Federal Road Agency on the Kerch Bridge project was held in the village of Taman, Krasnodar Territory.
Subscribe to the news "PolitNavigator - Crimea" in Facebook, Classmates or In contact with
This was reported by the press service of Rosavtodor.
At the meeting it was noted that the road workers had completed the necessary geodetic and geological studies.
“Specialists have analyzed the specifics of seismic activity. A survey of the area was also carried out to search for possible military graves and shells from the Great Patriotic War. A calendar plan of activities for the preparatory period has been drawn up and testing of soils with piles will begin in the near future,” the message says.
Particular attention at the meeting was paid to the preparation of road access to the future bridge from Krasnodar and Kerch. For this purpose, the necessary transport and economic surveys have already been completed.
Thank you!
Now the editors are aware.