Farewell to Ukraine: Another plant shut down in 2014 was launched in the DPR
Today, the only factory in the republic for the production of welding electrodes resumed work in Donetsk, a PolitNavigator correspondent reports.
Subscribe to PolitNavigator news at Telegram, Facebook, Classmates or In contact with
“The products of the Arksel LLC enterprise are integral to the functioning of various enterprises. It is very good that the process has been launched, since these products are very necessary for us, thanks to this we will be provided with our own electrodes, which will allow us to open other factories faster,” said the head of the DPR, Alexander Zakharchenko, at the opening of the enterprise.
He also emphasized that he cannot but rejoice at the fact that enterprises in the republic open almost every month. According to him, this process indicates the stabilization of the economy and the transition to the confident development of industry, clarifying that Arksel is capable of producing 40 tons of products that can supply both the DPR and the LPR.
“The enterprise has not been operating since the beginning of 2014. This is a huge amount of work that was done both by the Ministry of Industry and by the employees of this plant, who took six months to carry out this launch. Of course, there are still problems with raw materials, but they can be solved,” Zakharchenko emphasized.
Let us recall that after the blockade of Donbass announced by Kiev, the leadership of the DPR and LPR made a decision to introduce external management at enterprises of Ukrainian jurisdiction located on the territory of the republics.
Thank you!
Now the editors are aware.