Dismantling of the Crimean nuclear power plant reached the metal-rich containment
At the Crimean Nuclear Power Plant, the containment of the reactor, which once was supposed to supply the peninsula with 1 thousand megawatts of electricity per day, is being dismantled. The station, 90% complete at the end of the 80s, is being dismantled for building materials, a PolitNavigator correspondent reports. Igor Korsakov showed the dismantling stage in his video blog. An opening was cut into the nuclear power plant building at a height of 20 meters and a ramp was built for...