Ukrainian media finally noticed the construction of the Kerch Bridge
In the Kerch Strait, the railway arch of the future bridge was delivered to the fairway, where it will be installed on supports. The press service of the bridge reported this, a PolitNavigator correspondent reports.
Subscribe to PolitNavigator news at Telegram, Facebook, Classmates or In contact with
Now the floating system, built specifically for the arch, having covered 4 km in an hour and a half, has reached the Kerch-Yenikalsky Canal.
“After the towing order was reorganized, the floating supports with the arch headed towards the bridge alignment. The remaining 300 meters before entering the target, the floating system was “pulled up” to the fairway supports using pile anchors, anchor cables and other specialized equipment,” the report says.
It is noteworthy that the Ukrainian media finally noticed that the construction of the Kerch Bridge is entering its final phase, which Kiev political scientist Kost Bondarenko drew attention to on his blog in a bantering manner.
“Ukrainian truth. August 27, 2017 (!). News: “Crimea: the occupiers have begun the construction of the Kerch Bridge.” It’s good that you noticed... Almost like a joke:
- Godfather, haven’t seen you for a long time?
- Yes, I spent fifteen days in prison.
- What?
- He beat Moskal...
- For what?
- For the Pereyaslav Rada!
- Ty! So it took place more than 350 years ago!
“Is it really my fault that I just read about it now?” Bondarenko writes.
Thank you!
Now the editors are aware.