In Kharkov, the Malyshev military plant was cut off from electricity due to other people's debts
Kharkov, March 27 (Navigator, Olga Nikolaeva) – In Kharkov, for 3 days, the Frunze Plant, which has no debts to resource suppliers, was disconnected from the power supply due to the debts of the defense Malyshev Plant, which is located on the same power line.
This was reported by the Kharkov website “City Watch”.
Subscribe to the news “Navigator - Kiev” в Facebook or In contact with
Attempts to resolve the situation do not yield any results: the management of the Malyshev Plant is not responding.
The Frunze Plant sent letters to the head of the regional state administration, Igor Baluta, and the head of the state concern Ukroboronprom, Yuriy Tereshchenko, with a request to personally intervene in the situation.
“Every day of downtime leads to a shortfall in production of about 630 thousand hryvnia, as a result of which the budget receives a daily shortfall of about 122 thousand hryvnia,” reports the management of the Frunze Plant.
It is reported that similar outages have occurred repeatedly in the past.
The Frunze Plant produces perforated metal sheets and products made from it.
The state enterprise "Plant named after Malyshev" produces military combat and engineering tracked vehicles, motorcycles, agricultural equipment (harvesters, mowers), diesel engines, transmissions for buses and trucks, etc.
Thank you!
Now the editors are aware.