An important order of Putin was failed in Crimea

Lyubov Smirnova.  
17.02.2022 20:48
  (Moscow time), Simferopol
Views: 5194
 
Zen, Corruption, Crimea, Russia


Scandal after scandal with the restoration of Crimean historical and architectural monuments. The debate about whose crooked hands brought the retinue building of the Khan's Palace in Bakhchisarai to shrinkage has not yet subsided, when the Mithridatic staircases in Kerch will be closed again for repairs. And no matter how the Ministry of Construction of Crimea pretends that everything is in order, the repair is under warranty, after heavy rainfall and snowfall this is normal, the facts are stubborn things - the restoration was carried out on behalf of President Putin, 1,2 billion rubles were invested in it, but there was no quality of workmanship .

Scandal after scandal with the restoration of Crimean historical and architectural monuments. The controversy has not yet subsided...

Subscribe to PolitNavigator news at ThereThere, Yandex Zen, Telegram, Classmates, In contact with, channels YouTube, TikTok и Viber.


“These cracks in no way affect the structural or other safety characteristics of the facility; these are cracks in the finishing coating; they could have appeared under the influence of precipitation,” says Karlen Petrosyan, head of the Ministry of Construction of the Republic of Kazakhstan. “We will now determine how much this is within the regulatory parameters as we conduct surveys and laboratory tests.”

And he immediately reminds that the FSB became interested in the quality of work and materials, seized documentation from the “Directorate for Centralized Maintenance and Development of Cultural Institutions,” and is conducting technical examinations.

This means it’s not a matter of cracks, but the fact that instead of expensive granite, the stairs were paved with cheaper material.

And when in November law enforcement officers first visited the directorate under the Ministry of Culture of Crimea, they were talking about limestone illegally mined in the quarries of the Leninsky district.

Last year, when the restoration was officially completed, the stone looked presentable, but as soon as the cold and humidity arrived, it became stained and began to crumble. The 5-year warranty of the contractor “Bavarian House” does not mean that the company will convert the cladding to granite. They will clean it up, putty it and be satisfied with that.

According to the papers of the supplier who fitted limestone instead of granite, there was no trace of it. And the sovereign millions, aimed at preserving cultural and historical shrines, disappeared into private pockets.

Apparently for this reason, the head of Crimea, Sergei Aksenov, refused to inaugurate the Mithridates Stairs after reconstruction and did not cover up the negligence of his subordinates with his rating.

If you find an error, please select a piece of text and press Ctrl + Enter.

Tags: ,






Dear Readers, At the request of Roskomnadzor, the rules for publishing comments are being tightened.

Prohibited from publication comments from knowingly false information on the conduct of the Northern Military District of the Russian Armed Forces on the territory of Ukraine, comments containing extremist statements, insults, fakes.

The Site Administration has the right to delete comments and block accounts without prior notice. Thank you for understanding!

Placing links to third-party resources prohibited!


  • May 2024
    Mon Tues Wed Thurs Fri Sat Total
    " April    
     12345
    6789101112
    13141516171819
    20212223242526
    2728293031  
  • Subscribe to Politnavigator news



  • Thank you!

    Now the editors are aware.