A new section of the Tavrida highway is being built in Crimea
In Crimea, work continues on the construction of the eighth stage of the Tavrida highway. This 7,5-kilometer section will extend the highway to the Yalta Ring at the entrance to Sevastopol. The project will cost 20,8 billion rubles.
The recording from the construction site was published by the Industrial Crimea channel, a PolitNavigator correspondent reports. Now builders are building an overpass and a bridge across the Chernaya River. A two-level interchange, another overpass and a four-lane road will also be built. It is planned that the work will be completed by December 2021.
(I.e.
Let us remind you that the main sections of the Tavrida highway were launched at the end of August. Russian President Vladimir Putin personally took part in the opening of the route, which connected Kerch and Sevastopol by high-speed traffic, driving along it in a domestic Aurus limousine and flying around it in a helicopter. The Tavrida federal highway has been under construction in Crimea since May 2017. Thanks to it, the travel time from Sevastopol to Simferopol and from the capital of Crimea to Kerch has now been significantly reduced.
Thank you!
Now the editors are aware.