Akhmetov is building a reserve railway in Mariupol
Mariupol, January 04 (PolitNavigator, Victoria Litovchenko) – To reduce the time required to restore railway communication between the Mariupol sea trade port and metallurgical enterprises, construction of a reserve railway track has begun.
Subscribe to the news "PolitNavigator - Kiev" в Facebook, Classmates or In contact with
Financing of work and provision of rail products is carried out at the expense of the Ilyich and Azovstal metallurgical plants of the Metinvest Group.
At the moment, the railway track has been laid at the bypass bridge from the side of the Sartana station, ballasting and tamping work have been carried out. Also, taking into account the opinions of residents, work is being carried out to fill the road along the residential sector, the enterprises say.
Let us note that earlier local residents complained to the publication “0629” that the new tracks actually pass under their windows.
As PolitNavigator reported, on December 23, a railway bridge across the Kalchik River at 1260 km was blown up in Mariupol. railway section.
Thank you!
Now the editors are aware.